Arrival evidence guide

Steel Arrival Damage: Preserve a Traceable Receiving Record

A dent close-up without a shipment and unit ID cannot tell the full story. At the first safe receiving stage, record the handover and load condition before moving to affected steel units.

Chat on WhatsApp
01 · Handover record

Identify the Shipment Before the Load Changes

At the first safe stage, record the delivery date and time, receiving location, carrier or vehicle/container reference, and seal number and condition where one applies. Keep the purchase order, packing-list version, delivery receipt and transport-document reference together. Name who witnessed opening or handover. These details let another person connect your later photographs to a particular shipment. They do not by themselves establish when damage occurred or which party is responsible. Follow your site's unloading and safety procedure before any closer inspection; do not enter or release an unstable load merely to complete a photo list.

  • Transport referenceRecord truck/container, carrier, seal and delivery-document identifiers.
  • Order referenceAttach the PO and packing-list version used for the expected units.
  • Handover momentLog place, time, witnesses and the first safe observation stage.
02 · Load context

Photograph the Load and Packaging Before the Dent

Start with safe overview images showing the door or opening, load position, restraints and any visible moisture or impact. Then document the outer package, straps, pallets, supports and protective wrapping before taking close-ups. A steel coil, sheet stack, pipe bundle, bar bundle and profiled-sheet pack expose different surfaces and labels; photograph the relevant unit in its actual packing rather than assuming one standard layout. Keep the sequence and time of images. If a package must be moved for safety, record why and what was visible before and after; the receiving team should not risk injury to preserve evidence.

  1. Overview

    Show the unopened or first safely opened load and its restraints.

  2. Package

    Capture supports, wrapping, straps and visible transit marks in context.

  3. Close-up

    Only then show the localized mark with scale, orientation and its nearby label.

03 · Unit and document map

Link Every Concern to a Counted Steel Unit

Compare the expected packing-list units with those actually visible or safely unloaded, recording shortages separately from damaged units. For each concern, keep the package, coil, heat/lot or piece mark, its position in the load, affected quantity and a location-mapped photo. A wet outer wrap is not proof that every inner piece is corroded; a crushed corner does not define the usable material left. Separate what you saw from later measurements or tests.

Record lineCapture at receipt
ShipmentPO, transport and packing-list reference, time and witness
UnitForm, package ID, coil/heat/lot or piece mark, expected and seen count
ObservationContext and close-up image, location, scale and visible condition
Later checkAny measurement, test method and result under the actual order rule

Keep the labels and document trail with the affected unit so a joint inspection can revisit the same material.

04 · Exception and isolation

Note the Handover Exception and Preserve Affected Stock

Where visible damage or shortage exists at handover, follow the applicable receipt process for recording the exception and retain a copy of the actual notation. If a concern appears only during later safe opening, record when it first became visible and who was present. Keep the before-and-after sequence instead of rewriting the handover story. Identify and separate affected units and packaging so their labels remain legible; avoid cutting, recoating or mixing them into production before the evidence needed for a joint decision is saved. This record does not prove causation or settle a claim by itself.

  1. Visible at handover

    Retain the remark made under the actual delivery procedure.

  2. Found after opening

    Record discovery time and the previous package evidence separately.

  3. Affected units

    Keep marks, packaging and material segregated for a repeat check.

05 · Notice packet

Send the Evidence Through the Shipment's Actual Notice Paths

Use the purchase and carriage documents to identify the right contacts for the seller, carrier, insurer or surveyor, and your own purchasing and quality teams. Deadlines, notice methods and responsibilities depend on the actual contracts and policy; this guide does not create one universal period or decide liability. Provide the shipment and delivery references, handover notation, packing list, unit counts and IDs, ordered photo sequence and immediate observations. Send later material test results as a separate record tied to the same units. Ask the responsible contract owner which notices or survey steps are required before deciding repair, replacement or payment.

  • Seller and orderUse the agreed sales contact and PO reference for the material question.
  • Transport and insuranceFollow the actual carrier and policy channels and deadlines.
  • Internal decisionKeep one traceable record for the receiving, quality and purchasing owners.

Frequently Asked Questions

Get a quotation

Tell Us What You Need

Send the product form, grade, finish, thickness, width, length and quantity. Inquiries are answered within 2 hours.

Chat on WhatsApp
Send Inquiry

Send an arrival exception record

Share the PO and delivery reference, packing list, unit IDs, photos in time order, receipt notation and any later inspection result; follow your contract's notice paths separately.