Procurement comparison guide

Compare Steel Coil Quotes on the Same Basis

The cheapest number is not necessarily the lowest-cost compliant offer when the material, single-coil configuration, documents or delivery obligations differ. Build one requirement column, then compare each quotation line against it. ICC explains that Incoterms rules address delivery tasks, costs and risks; a delivery term needs its named rule, edition and place before two quotes can be treated as the same basis.

Chat on WhatsApp

Material

Same designation, form and condition

Quantity

Same unit, coil split and tolerance

Scope

Same documents and services included

Delivery

Named rule, edition, place and date

01 · Same-basis decision

Build a Requirement Column First

Start with the drawing or purchase specification, not the suppliers' price lines. Make one row for each field that affects acceptance: complete grade and standard, form, finish, dimensions, condition, certificate, coil configuration, packing, delivery basis and date. Leave an offer cell open if a seller has not answered it; a blank is a clarification request, not a match.

Do not compare quoted totals until the material and scope rows line up. ICC's explanation of Incoterms shows why the delivery line also needs a named rule, edition and place. Two prices using different delivery obligations are not on the same basis merely because both are expressed per tonne.

CheckCompare in both offers
Grade and standardComplete designation and applicable standard
Form and finishProduct form, condition and requested surface
Dimensions and toleranceOffered thickness, width and tolerance basis
Quantity and packingTotal quantity, coil split and packing terms
Delivery term and placeNamed rule, edition and named place
Price basis and validityUnit, currency, included scope and offer validity
Lead time and documentsQuoted timing and required certificate scope
ExceptionsEach deviation from the purchase requirement
Blank side-by-side worksheet comparing two steel offers by grade, form, dimensions, quantity, delivery term, price basis, documents and exceptions.
Normalize both technical and delivery terms before comparing price; enter only terms confirmed in each actual offer.
02 · Material match

Match the Material and Coil Configuration

Compare the full designation, standard edition, delivered form, thickness, width, finish and delivery condition on each quote. Keep a proposed grade change or different surface in a separate comparison row until the technical owner approves it. A shorter material name on one quote should be clarified, not silently treated as equivalent.

Then compare the actual coil split: required inner diameter, maximum outer diameter, mass per coil and number of coils. This matters if your uncoiler, loading route or order plan has limits. Ask the seller to repeat the agreed configuration on the final offer instead of combining dimensions from separate catalogue examples.

For prepainted offers, put the PPGI or PPGL base, substrate standard, metallic coating designation, paint system on each face, approved color sample, delivered form and finished dimensions in separate comparison columns. A coil price and a profiled-sheet price are not interchangeable quantities; use the same accepted specification and delivery unit before judging the price difference.

03 · Quantity and price

Put Quantity and Price on One Unit Basis

Record whether the quote is for total shipment mass, theoretical mass, net shipped mass or another stated invoicing basis. Ask for unit price currency, the quantity tolerance and whether the price applies to the entire order or to each size line. Keep any separate charges visible rather than folding them into a guessed comparison total.

A useful comparison sheet has columns for the requested basis, each seller's stated basis, missing information and an adjustment that the seller has confirmed in writing. Do not invent a freight, tax or exchange-rate value to force two incomplete offers into one number.

Quote request

Have a Specification Ready?

Send what you already know, such as grade, finish, size or quantity. Inquiries are answered within 2 hours.

Chat on WhatsApp
04 · Documents and services

Separate Documents and Optional Work

List the required certificate type, inspection report, marking, packing, splitting or other work as separate rows. For each quote, record whether the item is included, optional, excluded or still unconfirmed. A promise to provide a certificate should identify which actual heat and tests it will report.

If the order requires a third-party inspection, special packing or additional processing, ask who arranges it, who pays, when it occurs and what record will be provided. Do not treat an unnamed service as included just because a seller can discuss it.

05 · Delivery terms

Compare the Named Delivery Basis

ICC describes Incoterms rules as allocating delivery tasks, costs and risks. For each quote, write the complete named rule, edition and place. Check the stated loading point, carrier or terminal arrangement, export documents, insurance if relevant, and the point at which risk changes. Do not infer those details from a three-letter code without its named place.

Also compare the proposed shipment date, validity period and any condition that could change the price before order acceptance. If delivery bases differ, ask the sellers to re-quote on one agreed basis or obtain documented costs for a transparent comparison; this guide supplies no rate or delivery promise.

06 · Clarification questions

Send One Clarification List to Each Seller

Before deciding, send each seller the same unresolved row list: material identity, configuration, documents, price unit, named delivery basis, date and exclusions. Ask them to mark deviations explicitly and issue a revised written offer. Compare only the latest accepted versions, retaining the previous quote and clarification trail.

The final decision can then separate technical compliance from commercial preference. A lower price on a different material, missing certificate or different delivery basis is a different proposal, not evidence that the approved specification is cheaper.

Frequently Asked Questions

Sources

  1. Incoterms rules official overviewInternational Chamber of Commerce · Accessed 2026-09-25
  2. Incoterms 2020 Digital Library Q&AInternational Chamber of Commerce · Accessed 2026-09-25
Get a quotation

Tell Us What You Need

Send the product form, grade, finish, thickness, width, length and quantity. Inquiries are answered within 2 hours.

Chat on WhatsApp
Send Inquiry

Send Your Inquiry

Name, email and your inquiry are all that is needed. Add a WhatsApp number if you prefer to chat.

Tell us what steel you need. You can include the grade, size, quantity or intended use if available.

Inquiries are answered within 2 hours.